HB
434.5 km gas (2018)
total: 9 km (2018)
standard gauge: 9 km (2018) 1.435-m gauge (electrified)
note: belongs to the Austrian Railway System connecting Austria and Switzerland
comparison ranking
total: 630 km (2019)
paved: (2019)
comparison ranking
28 km (2010)
comparison ranking
total: 20
by type: bulk carrier 16, general cargo 1, other 3 (includes Switzerland) (2022)
comparison ranking
NOTE: The information regarding Liechtenstein on this page is re-published from the 2023 World Fact Book of the United States Central Intelligence Agency and other sources. No claims are made regarding the accuracy of Liechtenstein 2023 information contained here. All suggestions for corrections of any errors about Liechtenstein 2023 should be addressed to the CIA or the source cited on each page.
This page was last modified 22 Aug 23, Copyright © 2023 ITA all rights reserved.